Satellite and payload test systems
- Power and launch EGSE
- Platform, payload and instrument EGSE
- Central check-out equipment
- Thermal EGSE and real-time simulators
Draft, 26 November 2026
HC Andersen Capital made this draft for Rovsing A/S on 26 November 2026. Texts, figures and images are provisional and not approved by Rovsing.
The rack is our own 3D model, drawn after Rovsing's product photos. The finished site comes with a full back end, so Rovsing can update pages, announcements and figures itself.
Ejby Industrivej 34-38
DK-2600 Glostrup
Test systems for spacecraft, since 1992
Rovsing designs and builds the systems that test satellites and their payloads before launch. For ESA, NASA and Europe's prime contractors.
Scroll to open the rack
Inside the rack
Ground support equipment stands in for what is not there yet: the sunlight on the solar wings, the battery, the launch umbilical, the ground station. Engineers connect the spacecraft and run it as if it were flying.
Blueprint
Power simulation, protection, interfaces and the software that runs them. Rovsing designs the hardware, writes the code and builds the racks.
Point at a unit
RO-5100 solar array simulator
A solar array simulator plays a satellite's solar wings back to it, from full sun through eclipse and back, with the fast response that high fidelity simulation needs.
On Artemis, Rovsing racks emulate the four solar wings of Orion's European Service Module, all 36 sections, with RO-5100 modules.
Missions
Rovsing equipment has tested hardware for Artemis, Galileo, Copernicus and EnVision.
Missions
A Level-1 supplier to Airbus Defence and Space, Thales Alenia Space and OHB, on programmes funded by ESA, Eumetsat, the EU, NASA and commercial customers.
Orion European Service Module
Solar array wing front end equipment, at Lockheed Martin in Colorado, NASA Kennedy Space Center, Airbus in Germany and France, and Leonardo in Italy.
ESA
Satellite interface simulators for the instrument teams, NASA JPL among them. The first sets shipped in May 2026.
Thales Alenia Space, Italy
Check-out racks for Europe's next navigation satellites. Delivery completed in 2026.
CIMR, CRISTAL, LSTM, ROSE-L
On four of the six new missions of Europe's Earth observation programme.
Airbus Defence and Space
A simulation front end for the mission that maps Earth's gravity field.
OHB, for ESA
Thermal ground support equipment that simulates the spacecraft's thermal environment.
Thales Alenia Space, Italy
Test racks for the secure communications satellites of Italy's defence.
The Exploration Company
Independent software verification and validation for the reusable cargo vehicle, until 2028.
What we do
Rovsing sells complete test systems, the products inside them, the software that runs them and the engineers who know them.
Rovsing in numbers
Customers include
Strategy
Record European space budgets carry the core business. New markets and acquisitions come on top. From the strategy update of 10 November 2026.
A record ESA budget and a near-tripled Danish commitment flow into the core institutional business.
EGSE and ISVV for New Space, defence and commercial customers, and Earth observation services with Marble Imaging from 2027.
Acquisitions that add scale, capabilities and market access. Target screening is under way, no transaction is agreed.
Sources: Rovsing annual report 2025/26 and strategy update, 10 November 2026.
Investors
The share
ROV
Investor contact: Sigurd Hundrup, CFO.
Careers
About 30 electronics, software and space engineers in Glostrup, on missions to the Moon, to Venus and to every orbit in between. Students from DTU write their theses with us.
Senior hardware engineer Flemming Gøttsche has been with Rovsing for 20 years. He is the father of many of our products, among them the RO-5100.